
Medium Duty Sliding Shelffor 4Post and 2Post RacksInstallation Instructions Kit P/N: 1USHL-115 (4Post) Kit P/N: 1USHL-015 (2Post)Patent(s) Pending
Page 2 Kit Contents(1) Partially Assembled Shelf(1) Anti-Slip Mat 12”x15”(1) 50” Velcro Strap for Cable ArmBrackets:(2) Rear Rack Brackets(1) Remova
Installation Instructions Page 3Step 4. Rear Bracket Attachment: Move the slide rails back approximately 8". You may need to loosen the thumb s
Step 5. Cable Management: Attach the two Arm Attachment Brackets to the back of the Shelf as shown below. Attach using (4) 8-32 x 3/8” at head scre
Page 5Step 6. Cable Arms: Attach the two Cable Management Arms using three 2.5” clevis pins.Note: Cable management may be installed on opposite sid
Page 6 Installation InstructionsStep 7. Rack Installation: Attach the front and back of the Shelf to the rack. Hardware is provided for square hole r
Page 7Installation InstructionsStep 8. Server Installation: Pull the shelf out of the rack until it stops. Attach the Removable Front Stop (shown b
Warranty StatementInnovation First, Inc. warrants our products against defects in material and workmanship for a period of one (1) year from the date
Comentários a estes Manuais